Embraer Air

Embraer Air
Nashville, TN
September 2005
About the project
Embraer Air needed a way to work on the tail section of their Model
EMB-145. Safway Engineering made a site visit to the Nashville hanger where field measurements of the aircraft were taken. Engineers designed a scaffold platform that would allow the customer to remove the tail section of the aircraft and let it rest on the upper platform while they did the 1,400 hours of inspections.
The scaffold platform, with special lyengineered stairways, not only met the customers needs, but allowed for walkways under the scaffold to remain open. The customer has since stated that the scaffold platform met their needs and allowed for the aircraft to be completed two days early - the equivalent of 360 man hours of savings.
Products used
Systems™ Scaffold
Services used
Engineering; Labor