Español

Access & Industrial Services

Projects

Aecon Fabrication Yard

Aecon Module Fabrication Yard
Edmonton, AB
2003
About the project
Scaffold provided access to build 84 different steel modules. At this facility, these structures are pre-fabricated with piping, vessels and equipment and then shipped to industrial plants. In this case, these 84 different modules will be trucked 450 km (280 miles) to Fort McMurray, Alberta.
Products used
SafLock System scaffold; tarps
Services used
Labor

Find Your Local Branch