Español

Access & Industrial Services

Projects

National Archives

National Archives
Washington, D.C.
May 2008 - December 2008
About the project
The historical restoration of the four exterior colonnades on the Washington, D.C., National Archives required scaffold solutions from the Safway Laurel branch. We provided all access for the project with the help of our Systems™ Scaffold and Suspended Power Swings. Normally a 12-month project, the restoration was accelerated to eight months to ensure completion for the Presidential inauguration in January 2009.
Products used
Systems™ Scaffold; Power Swings
Services used
Engineering

Find Your Local Branch