Milwaukee City Hall Restoration
Milwaukee, WI
August 2005 - 2008
About the project
The Milwaukee City Hall Restoration project showcases specialty Safway engineered scaffold components, specialized safety training, and multiple Safway® scaffold products. Scaffold surrounds the 108-year-old Milwaukee landmark on all four elevations, at its highest point, extended up 396 feet from the ground.
The restoration project includes the dismantlement/repair/replacement of the entire south tower including the copper roof, concrete ring beams and upper floors, as well as the clock faces, tuck-pointing 50 percent of the brick mortar joints on the entire structure, the repair or replacement of terra cotta detailing, and the replacement of 1,900 window glazing units.
Products used
Systems™, Engineering, Shoring/Adjust-A-Shore, Champion Hoists, Sidewalk Canopies, Post Shores, I-Beams, Systems™ Modular Stair Units
Services used
Labor Services, Project Management, Scaffold Safety Training