Masonic Temple

Masonic Temple
Philadelphia, Pa.
December 2007 - December 2008
About the project
The Safway Philadelphia branch provided more than 12,500 man hours building Systems™ Scaffold around the exterior of The Masonic Temple in Philadelphia. The scaffold scaled four of the walls around the temple: three elevations stood 90 feet high and the fourth was almost 200 feet high on the front elevation.
In supplying scaffold for the surrounding façade, Safway was able to provide multi-craft access to the entire building for masons, painters, caulkers, glazers and roofers for building restoration. The contractor, JJ Deluca, was very happy with Safway's work on the project .